Namma Bangalore Metro Green Line Timings

Bangalore Metro Green Line Schedule

Monday to Friday Timetable with reference from NGSA to PUTH
Line -2 NGSA to PUTH - 18.06.2017.
HEADWAY  - Ref NGSA/PYID. HEADWAY  - Ref PUTH.
FROM TO Head way FROM TO Head way
Pilot Train   05:00:00 Pilot Train   05:00:00
05:30 05:50 20 mins 05:30 05:50 20 mins
05:50 06:35 15 mins 05:50 07:28 15 mins
06:35 06:55 10 mins 07:28 07:48 10 mins
06:55 08:08 8 mins 07:48 09:01 8 mins
08:08 08:35 7 mins 09:01 09:22 7 mins
08:35 10:00 6 mins 09:22 10:46 6 mins
10:00 10:15 7 mins 10:46 11:00 7 mins
10:15 10:40 8 mins 11:00 11:33 8 mins
10:40 16:00 10 mins 11:33 16:53 10 mins
16:00 16:48 8 mins 16:53 18:03 8 mins
16:48 17:10 7 mins 18:03 20:19 6 mins
17:10 19:39 6 mins 20:19 20:50 8 mins
19:39 20:05 8 mins 20:50 21:20 10 mins
20:05 21:30 10 mins 21:20 22:05 15 mins
21:30 22:50 20 mins 22:05 23:00 20 mins
           
Note:
  1. Pilot train  will depart  from NGSA & PUTH at 5:00AM  with restricted speed with passenger  reach KGWA at 5:30 AM .
  2. Stations are opened for passenger 10 min before  the departure of the Trains.
  3. Normal revenue service start from NGSA & PUTH at 5:30 Hrs.
  4. The frequency of train service  with reference to the train starting stations i.e. NGSA & PUTH.
  5. Normal revenue service ends  from NGSA  at 22:50 Hrs and from PUTH at 23:00
  6. At KGWA interchange point  Last Normal revenue service ends   at 23:25hrs.Station entry will be closed at 23:10 Hrs.
  7. Station controller KGWA ( N-S) take clearance from E-W controller that LAST TRAIN arrived and all deboarded passenger are clearance of  the PF-3 & 4  before departing of trains  towards  BYPH &MYRD. 
Green Line Route Bangalore Metro Green Line Route Map