Jaipur Metro Stations

The Jaipur Metro Stations being built in 2 Phases. The phase 1 is divided in Phase 1A and Phase 1B. And the other one is Phase 2.

Jaipur Metro Phase 1A

In first Phase the number of operational stations in Pink Line are 9 and 9.63 kilometres (5.98 mi) of route length of which 0.95 kilometres (0.59 mi) is underground and 9.13 kilometres (5.67 mi) is elevated. The starting Station is Mansarovar and the last station is Chandpole.

Jaipur Metro Phase 1B

The Pink Line Phase 1B will get completed in March 2020. This will extend the Pink Line by (2.349 kilometres (1.460 mi) and which included 2 stations. The two stations are Chhoti Chaupar Metro Station and Badi Chaupar Metro Station.

Jaipur Metro Phase 2

The Jaipur Metro Phase 2 (North-South Corridor) which will get completed in 2021. The Jaipur Metro Orange Line will be 23.099 kilometers which will serve 20 Stations. The orange line will connect the Sitapura Industrial Area in the South to Ambabari in the North via Ajmeri Gate and MI Road.